Dismiss Notice
Welcome to IDF- Indian Defence Forum , register for free to join this friendly community of defence enthusiastic from around the world. Make your opinion heard and appreciated.

Navy's Next Destroyer Line Christened Visakhapatnam-class, 1st Launch Next Week

Discussion in 'Indian Navy' started by AKIIN, Apr 15, 2015.

Thread Status:
Not open for further replies.
  1. AKIIN

    AKIIN 2nd Lieutant FULL MEMBER

    Joined:
    Nov 8, 2014
    Messages:
    365
    Likes Received:
    129
    Country Flag:
    India
    Navy's Next Destroyer Line Christened Visakhapatnam-class, 1st Launch Next Week

    [​IMG]

    The first Project 15 Bravo (P15B) stealth destroyer, under construction at the Mazagon Dock shipyard in Mumbai will be launched on April 20. Livefist can confirm that the new warship line has a name: Visakhapatnam-class, after the Navy's eastern hub. The navy is aiming to induct the ship in 2018. A total of four ships are to be built in the class, with the official timeline of deliveries starting 2018, and then a ship every two years till 2024. The Visakhapatnam's keel was laid in October 2013. Construction and fabrication of the second vessel of the class began in July last year.

    The Visakhapatnam-class maintains the same hull and propulsion package as the Project 15A Kolkata-class. Russia's Northern Design Bureau, enlisted as a design consultant has helped reduce the size of the design's superstructure.

    Meanwhile, the second P15A destroyer
    Kochi will be commissioned shortly into the Indian Navy.
     
  2. Anish

    Anish Lt. Colonel ELITE MEMBER

    Joined:
    Dec 2, 2011
    Messages:
    5,960
    Likes Received:
    1,794
    Country Flag:
    India
    Another name for Rubin design bureau which is offering the Amur subs for 75i also designer of Kolkata class ddg
     
  3. AKIIN

    AKIIN 2nd Lieutant FULL MEMBER

    Joined:
    Nov 8, 2014
    Messages:
    365
    Likes Received:
    129
    Country Flag:
    India
    All About the INS Visakhapatnam, Navy's Most Powerful Destroyer
    [​IMG]

    New Delhi: Three days before it is launched, fresh details have emerged about the Navy's newest destroyer, the Project 15B Visakhapatnam Class. Four ships of this class are being built in a Rs. 29,340 crore project.

    While the first ship will be named INS Visakhapatnam, NDTV has learnt that two of her three sister ships may be called INS Porbandar and INS Marmagoa. The final ship of the class will likely bear the name of a port in Gujarat. The names of the warships will need to be cleared by the President before being finalised.

    At 7,300 tonnes, Visakhapatnam will be the largest destroyer commissioned in the country and will be equipped with the Israeli Multi Function Surveillance Threat Alert Radar (MF-STAR) which will provide targeting information to 32 Barak 8 long-range surface to air missiles onboard the warship.

    The Barak 8 missile being co-developed with Israel is at present being integrated in the Navy's new destroyer, INS Kolkata and will be test-fired by October this year. Like the INS Kolkata, the Visakhpatnam will be able to fire 16 long range Brahmos anti-ship missiles.

    There are some important differences between the Navy's Kolkata class destroyers and the Visakhapatnam class though they share the same hull-design and Ukrainian-built Zorya gas turbines.

    • The Visakhapatnam will be armed with a 127 mm main gun while the INS Kolkata has a 76mm Super Rapid Gun Mount (SRGM). Both classes share the AK-630 close-in anti-missile gun system.
    • The sonar of the Visakhapatnam will be bow mounted and will feature a a revised bridge layout.
    • The design of the mast, which features the main radar has been revised. The Visakhapatnam will provide its crew greater protection in a nuclear, chemical or biological warfare scenario.
    • She also features a rail-less helicopter traversing system to secure the helicopter she carries in heavy sea conditions.
    • Central to the Visakhapatnam is network-centric layout. She is equipped with a Ship Data Network (SDN), an Automatic Power Management System and a Combat Management System. Essentially, all information critical for the operation of the warship during all operations is available to key officers through the SDN which the Navy describes as a data information highway.
    • The Visakhapatnam is being launched on April 20 and will be delivered to the Indian Navy in July 2018. The remaining three ships will be delivered at an interval of two years each.
     
    arulcharles likes this.
  4. AKIIN

    AKIIN 2nd Lieutant FULL MEMBER

    Joined:
    Nov 8, 2014
    Messages:
    365
    Likes Received:
    129
    Country Flag:
    India
  5. AKIIN

    AKIIN 2nd Lieutant FULL MEMBER

    Joined:
    Nov 8, 2014
    Messages:
    365
    Likes Received:
    129
    Country Flag:
    India
Thread Status:
Not open for further replies.

Share This Page