P-15A Kolkata-class DDG : News & Discussions

Discussion in 'Indian Navy' started by prototype, Jun 2, 2010.

  1. prototype
    Offline

    prototype Major SENIOR MEMBER

    Messages:
    2,050
    Likes Received:
    298
    The Kolkata class of guided-missile destroyers of the Indian Navy were conceptualized under Project 15A, and include land-attack capability as well as some signature reduction features.Three ships of the class are being built at Mazagon Dock Limited (MDL). The first vessel is expected to join the fleet in 2012.Four more ships are planned under Project 15B,and construction was approved by India's Defence Acquisition Council in February 2009

    In March 2009, the government gave approval for four more destroyers under Project 15B. Even though Type 15B retains the hull form of Kolkata class destroyers, there will be changes in the superstructure and will be far stealthier with better sound and infrared suppression systems. The Project 15B will be armed with the Nirbhay cruise missile of 1000km range, the hypersonic Brahmos-II cruise missile and Extended Range Surface to Air Missile (ER-SAM) with a range of 100 km

    Ships of the class

    INS Kolkata

    [​IMG]

    INS Kochi

    [​IMG]

    INS Chennai

    [​IMG]
     
    3 people like this.
  2. Indian
    Offline

    Indian FULL MEMBER

    Messages:
    32
    Likes Received:
    3
    Which ER -SAM it will be using , I think news was for Barack-II only and its range is 70 kms only not 100. And First pic, it doesnot look like new Kolkatta class destroyer, i think this is some old pic of any other warship.
     
  3. Devianz
    Offline

    Devianz 2nd Lieutant FULL MEMBER

    Messages:
    280
    Likes Received:
    29
    First pic is a veer class corvette.
    2nd pic is delhi class destroyer.
     
  4. prototype
    Offline

    prototype Major SENIOR MEMBER

    Messages:
    2,050
    Likes Received:
    298
    yes with the first pic i made a mistake,but the second 1,i dont think thats the delhi class destroyer
     
  5. jagjitnatt
    Offline

    jagjitnatt Major ELITE MEMBER

    Messages:
    3,352
    Likes Received:
    1,560
    The ER-SAM plans are for the Project 15B whereas Kolkata class is Project 15A.
    15B will be an upgrade of 15A and will be ready by 2020.
     
  6. Desi Jatt
    Offline

    Desi Jatt Captain ELITE MEMBER

    Messages:
    1,819
    Likes Received:
    340
    India-Israel is working on an extended range SAM which will be of 100 km range and will be on Kolkata class (15b)..not 70kms.

    1st pic is wrong..remaining two are ok.
     
  7. Devianz
    Offline

    Devianz 2nd Lieutant FULL MEMBER

    Messages:
    280
    Likes Received:
    29
    That is a Delhi class destroyer.... here INS Mumbai
    [​IMG]

    This is INS Kochi... would look same as INS chennai as both belongs to Kolkata class.
    [​IMG]
     
    1 person likes this.
  8. jagjitnatt
    Offline

    jagjitnatt Major ELITE MEMBER

    Messages:
    3,352
    Likes Received:
    1,560
    Project 15B is not kolkata class. It will be an upgrade of Kolkata class.
    Project 15A is Kolkata class.

    Kolkata class will have Barak 2 with 70 km range. But the project 15B will have a newer SAM system with over 100 kms range. It will also have Nirbhay cruise missile along with Hypersonic Brahmos - II.
     
  9. jagjitnatt
    Offline

    jagjitnatt Major ELITE MEMBER

    Messages:
    3,352
    Likes Received:
    1,560
    This is INS Kolkata
    [​IMG]

    These ships don't have their weapons and avionics mounted. They are still under trials. You'd only get their complete picture after 2011, when all the systems would be installed on the hull.
     
  10. gowthamraj
    Offline

    gowthamraj Lieutenant FULL MEMBER

    Messages:
    461
    Likes Received:
    32
    Too many delay for this ships. Looking AT this our aircraft carrier 1 will enter service in 2017 and second in 2022
     
  11. jagjitnatt
    Offline

    jagjitnatt Major ELITE MEMBER

    Messages:
    3,352
    Likes Received:
    1,560
    The first might enter earlier since it will be tested by the Russians.

    The indigenous carrier will take another 10 years to come into service. 3 years more for development and 7 years for trials and equipment fitting.
     
  12. gowthamraj
    Offline

    gowthamraj Lieutenant FULL MEMBER

    Messages:
    461
    Likes Received:
    32
    Indigenous AC only i saying. But our chief has over confidence and says it will inducted in 2014
     
  13. chachachoudhary
    Offline

    chachachoudhary Captain SENIOR MEMBER

    Messages:
    1,137
    Likes Received:
    460
    Weapons integration to a new platform always takes time. However, it will be lot easier for the subsequent ships of the same class and inductions will be faster.

    Our PAD and AAD will be ready in the next 5 years time, and Navy can have them.

    SECOND AND THIRD DESTROYERS OF KOLKATA CLASS

    [​IMG]
     
  14. gowthamraj
    Offline

    gowthamraj Lieutenant FULL MEMBER

    Messages:
    461
    Likes Received:
    32
    No way our ships have anti-ballastia missiles, it is very big for ships
     
  15. prototype
    Offline

    prototype Major SENIOR MEMBER

    Messages:
    2,050
    Likes Received:
    298
    is indian navy really working on the field of having anything like the aegis battleships
     

Share This Page